November 16, 2020
Tokyo is due to host the opening ceremony
Besides cost, her plan also drew complaints over aesthetics.0 billion yen ($1."I think this is a wonderful plan that meets criteria such as basic principles, construction period and cost," Prime Minister Shinzo Abe told a special cabinet meeting on the design.2 billion). Seating capacity will be about 68,000.Under the new China portable saw mill plan, construction is to be completed in November 2019, ahead of the January 2020 deadline demanded by the International Olympic Committee.It will have a height of 49.Japan on Tuesday chose a new, slimmed down 2020 Olympic stadium design, after an earlier version set off a row over a $2 billion price tag that would have made it the world’s most expensive sports venue.After deliberations, the JSC chose the slightly cheaper of the two, a joint venture involving renowned architect Kengo Kuma with an estimated cost of approximately 149.3 metres high, also featured a traditional Japanese touch in the use of 72 wooden columns, but planned three floors above ground and two below.The new plan, which calls for five floors above ground and two below, involves placing greenery on stadium decks to shut out Tokyo’s scorching summer sunshine. He added that merging the stadium with the abundant greenery surrounding the venue would prove to be a "legacy of Japanese style" that would outlast the 2020 event.The country’s preparations for the global games suffered a humiliating setback this year when the government pulled the plug on the original stadium plan by Iraqi-British architect Zaha Hadid following spiralling costs and complaints over the design.. Tokyo is due to host the opening ceremony on July 24 that year. The winning proposal, which beat one involving Pritzker Architecture Prize-winning Japanese architect Toyo Ito, is far below the price estimated under the now-ditched design by Hadid.2 metres (162 feet), lower than the original design of 70 metres, which was criticised as too high and for being a potential eyesore on Tokyo’s skyline.Two new plans — both by Japanese architects and with sharply lower cost estimates — were released last week by the Japan Sport Council, which is overseeing the project.The new plan aims to "create Japanese tradition" by using steel frames and wood with a concept of a "stadium of trees and green", according to documents submitted to the JSC."I am feeling the weight of the awesome responsibility," Kuma told private broadcaster Nippon TV right after the announcement.The other proposal, at 54.Explaining his design concept after the announcement, Kuma told reporters he wanted to use wood in the stadium’s partial roof.
Posted by: arundsaweinab at
02:40 AM
| No Comments
| Add Comment
Post contains 427 words, total size 3 kb.
11kb generated in CPU 0.0065, elapsed 0.035 seconds.
35 queries taking 0.0307 seconds, 48 records returned.
Powered by Minx 1.1.6c-pink.
35 queries taking 0.0307 seconds, 48 records returned.
Powered by Minx 1.1.6c-pink.